24' x 24' Garage Build - Footing dig & monolithic slab pour
2023 ж. 24 Қар.
104 543 Рет қаралды
24' x 24' Garage Build Part 1 - Here I dig the footing, build the forms for our concrete, laid and bent the rebar, and poured the monolithic slab.
24' x 24' Garage Build Part 1 - Here I dig the footing, build the forms for our concrete, laid and bent the rebar, and poured the monolithic slab.
You lost me when I saw a dump truck full of concrete. 😂
awesome job looking forward to the garage build
Thank you, that video should be up in a couple days.
Great work and looking forward to see more videos.
Thank you!
Really nice job digging those footings, and forming. I’ve done monolithic pours on smaller jobs like sheds, but never one that big. Great job!
Thanks 👍
Amazing job ❤
Good luck brother .👍🏻🇺🇸🇺🇸🇺🇸🇺🇸
Wow! 22k ! lost all my channels when I went premium …glad to find you again and nice garage!
That concrete will last forever
Bro did a 3ft foundation. That garage will withstand a direct nuclear explosion lol
20k subs, nice! Maybe do the ramp now…via the dump truck…probably won’t regret it lateron ✌️
Contractor poured slab for my addition in 0F temperature. I asked if he was crazy - this is the coldest day in years. Assured me it would be fine. 25 years later not a crack.
One thing I do if I hit a rock screwing up my trench is after pulling the stone out, I toss some of the backfill back in and drag the flat side of the bucket to keep it flat. Then I go back over (just one pass) with jumping jack and this helps me sleep at night. But idk anything about keeping concrete in shape.. I build walls on 3/4”
Thanks for the tip, I need to invest in a jumping jack.
nice work how much does something like this cost?
Great job! What did the two concrete mixer trucks cost you with delivery?
I'm surprised that you did not put down insulation underneath slab and along the edges to minimize any heat loss.
Great video. Can you explain why plastic is not installed under the beams arounder the perimeter of the foundation? Isn't moisture a problem there too?
Thank you, I'm no concrete expert but I believe the moisture is more of an issue for the slab and not the footings.
@@srmcontracting But the beams around the perimeter are also concrete, which are also subject to moisture wicking up from the soil. In fact, since moisture is most likely to accumulate around the perimeter of the slab from rain and roof runoff, I think moisture is the biggest concern in the area where there is no plastic installed.
Do you think the footing with slab on top is better then the thickened edge approach? How deep did you go?
Good Job, I had the concrete calculated at 22 yards assuming your trenches were 12 inches wide
There was a lot of over dig because of the rocky soil and that's what threw it off.
Nice work man I been following for a while. What are your short load fees around there?
Thank you, it's about $400 no matter how many yards you get.
Very rough finish, why not pay a couple of finishers? That floor will be hard to clear when oil is spilled on it.
Why didn’t you vibrate itv
Man just order 3 trucks
Set and poured a LOT of monos, never seen one done like that before. Yikes.
FYI it’s Cubic Yards
How much to build total with high costs of building materials here in Florida. I need an ADU built how much total
The whole garage build was about 22k but if your in FL you won't need a slab like this. You should be under 20k for sure. Also a pole barn might be a good option to look into.
that wide footing COST A FORTUNE! !UNREAL ...why wouldn't you use a 6 inch trencher ORlay up a cheap block wall?? WE overkill everything today because everybody is rich......
It's the stupid code. Unreasonable overkill fits all local building code.
Dump truck 🛻 with concrete. NEXT 😂😂😂
That was some thin plastic.
How many yards of concrete did you use?
It ended up being 28
what happens if no vapor barrier?
I did plan to put it but I forgot. It's not code for an out building and the building doesn't have HVAC so it's not a big deal.
How many days did you spray the slab?
3 days, after that the temps started dropping so I just left it covered up for about 10 days.
I got quoted 8500 does that sound correct
That sounds reasonable, materials alone are 5-6k
I would also guess that the materials are about 6k total. Then you add the exavator and labor for another 2k you end up at around 8000. So I would say 8500 CAD is on the higher end but still ok.
He used rocks to support the rebar. 😮 Is that Allowed?
Yes
Столько сделали, но плохо что выбиратором не прошли
🍔 🍔 🍔
норм
awesome job, do it once do it right so you don't have to do it again , pay no attention to the nay sayers/know it all
You have to invest in a tripod. Your videos are too short for this genre. Record 3 or 4 hours with sound of machines than edit down to 1 hour. Mix in a little voice over just context. Mute curse words if any. Great for educational purposes & business. Most important, place your business info at the bottom on the video screen. Watermark style. Give free business tees to best comments related to the video. Will help your retention rate and algorithm. Make sure your business info is on them. Cheap investment great for advertisement purposes. #construction #education #machine #building #garage #srmcontracting
I like bro !!!
A five dollar ground strap cost you over $1000. I think what you need to do is stick to your concrete business neither that or take a few courses on truck and vehicle repair.
99% Of People Wrong Watering Concrete Every Day After Pouring New Slab. Amén.
pretty sad not to know EXACTLY how much concrete you need
Yeah especially 4 yards short
The over dig and the rocky soil threw it off big time
He is doing just fine. Do better yourself before telling people how to do things
Why on earth would you dig a footing 36 inches?? Huge waste of time and materials.
American foundation work is illegal in most other countries. What a joke
why is that?
Obviously an unlicensed contractor. He doesn't know the building code / doesn't have a clue how deep footings are to be set. And the concrete companies in the area refuse to deliver to him.
Put down the pipe...
Some buddy missed the numbers 4 yards