Flood prevention measures | NCOC | Atyrau

2024 ж. 7 Сәу.
2 889 Рет қаралды

NCOC and its contractors provide joint assistance to local authorities in preparation for the flooding and the threat of rising water level in Atyrau Oblast.
In particular, to support Atyrau Oblast flood protection and control works by the present time about 50 pieces of equipment have been already provided. Currently, 19 equipment and 34 people have been allocated for building a 24 km flood bank near the Sokolok channel. The work is conducted 24/7 in day and night shifts under the supervision of Akimat.
NCOC's Onshore and Offshore facilities are operating as normal.
NCOC places top priority on safety of people and timely support in current situation. As a socially responsible company NCOC provides significant support to local authorities in these challenging times.

Пікірлер
  • Удачи вам в борьбе с водной стихией, братья!

    @umalatboynakli1688@umalatboynakli1688Ай бұрын
  • Аллаһ жар болсын Баршамызға

    @Sherkesh1.@Sherkesh1.Ай бұрын
  • Судың елдің мекенге зиянсыз кырга жайылған дурыс. Үш жыл малға азық өседі

    @mkm236789@mkm236789Ай бұрын
KZhead